Bengaluru International Airport Ltd.

In: Business and Management

Submitted By anupamshetty
Words 6371
Pages 26
INFRASTRUCTURE POLICY AND REGULATION

Bengaluru International Airport Limited

Individual Assignment -1

Anupam Shetty

Fourth Batch 2012 - 13

Bengaluru International Airport Limited

Contents: 1. Background……………………………………………………………….………………….…….……Page 4 2. Need for the airport…………………………………………………………………………………Page 4 3. Scope of the Project…………………………………………………………………………………Page 5 4. Project Sponsors/Concessionaires……………………………………………………………Page 6 5. Financiers…………………………………………………………………………………………………Page 7 6. Relevant Government Bodies…………………………………………………………………..Page 7 7. EPC Firms………………………………………………………………………………………………….Page 7 8. Regulators………………………………………………………………………………………………..Page 7 9. Concession and CNS/ATM Agreement……………………………………………………..Page 8 10. Financial Arrangements………………………………………………………………………….Page 8 11. Project Conception…………………………………………………………………………………Page 9 12. Bidding Process………………………………………………………………………………………Page 9 13. Project Shaping………………………………………………………………………………………Page 10 14. Master Plan and Projects……………………………………………………………………….Page 11 15. Agreements Signed in Chronological Order……………………………………………Page 12 16. Land & Peripheral Infrastructure……………………………………………………………Page 13 17. Project Execution/Construction……………………………………………………………..Page 13 18. After Completion……………………………………………………………………………………Page 17 19. First Test Flight……………………………………………………………………………………….Page 17 20. Reason for Delay in Opening BIAL………………………………………………………….Page 18 21. Revenue Realization……………………………………………………………………………….Page 18 22. Issues in Operations and Maintenance Phase………………………………………..Page 20 23. References……………………………………………………………………………………………..Page 25 1. Background HAL Bangalore International Airport also known as HAL Airport or Hindustan Airport, is the…...

Similar Documents

Case Study – Denver International Airport Baggage Handling System – an Illustration of Ineffectual Decision Making

...Denver Airport Baggage Handling System Case Study – Calleam Consulting Case Study – Denver International Airport Baggage Handling System – An illustration of ineffectual decision making Calleam Consulting Ltd – Why Technology Projects Fail Synopsis Dysfunctional decision making is the poison that kills technology projects and the Denver Airport Baggage System project in the 1990’s is a classic example. Although several case studies have been written about the Denver project, the following paper re-examines the case by looking at the key decisions that set the project on the path to disaster and the forces behind those decisions. Background What was to be the world’s largest automated airport baggage handling system, became a classic story in how technology projects can go wrong. Faced with the need for greater airport capacity, the city of Denver elected to construct a new state of the art airport that would cement Denver’s position as an air transportation hub. Covering a land area of 140 Km2, the airport was to be the largest in the United States and have the capacity to handle more than 50m passengers annually [1,2]. The airport's baggage handling system was a critical component in the plan. By automating baggage handling, aircraft turnaround time was to be reduced to as little as 30 minutes [1]. Faster turnaround meant more efficient operations and was a cornerstone of the airports competitive advantage. Despite the good intentions the plan rapidly dissolved......

Words: 5428 - Pages: 22

Preparedness of Raleigh Durham International Airport for a Terrorist Attack

...Preparedness of Raleigh Durham International Airport for a Terrorist Attack Daniel Hammer American Military University Spring 2011 Abstract This research paper will address the current security policies at Raleigh-Durham International Airport in Raleigh, North Carolina. The current security policies will be scrutinized and see if they are capable in deterring a terrorist attack. They will be compared and a number of fields, such as usefulness, cost effectiveness, and to foreign nations airport security policies, as well as other airports in America. Finally, the airport security policies will be checked for weak points and flaws that terrorists may utilize for an attack. Introduction to the Study America’s airports are a gateway in and out of the nation. Unfortunately, they are also a focus of terrorist attack. America’s airports have security measures in place to deter and stop terrorist attack, but are actually capable in doing so? Specifically, is Raleigh-Durham International Airport capable of withstanding a terrorist attack? How effective are the security measures in stopping a terrorist attack? Is the cost of the security measures reasonable? Are the security measures violating American rights? And, How effective are the security compared to both foreign nations, and to pre 9/11? These are the questions that will be addressed in this case study. Purpose of this......

Words: 3336 - Pages: 14

Denver International Airport

...Denver International Airport Project Communication Plan Prepared by: Date: 6/15/12 Version: Master Plan Document Purpose Communication is a critical component in project delivery. It must be delivered in a timely and effective manner to all project stakeholders in order to meet objectives and achieve project goals. This document will detail the execution of all communication regarding the Denver Airport Project. This includes, but is not limited to, communication to and from executives, managers, and the project team. It will also discuss the means and frequency by which communication will be delivered. Overview The Denver International Airport project consists of designing and constructing a new airport, based upon a “Home-on-the-Range” design. The City of Denver requires a wide open entry point for visitors. The airport is to maintain a distinctive look that will be easily identified by travelers. This design must meet specifications provided by the City of Denver. The new airport should allow for more traffic in and out of the airport, while also becoming less congested. Improvements to runways will lead to a more efficient operation of the regional airspace, significantly reducing aircraft delays and airline operating costs. The new airport will also result in reduced noise impact, as it is being built on a relatively large site in an unpopulated area. The overall layout will be more efficient in reducing passenger walking distance, while also......

Words: 1331 - Pages: 6

Denver International Airport

...1. Is the decision to build a new airport at Denver strategically a sound decision? 2. Perform an analysis for strengths, weakness, opportunities, and threats (SWOT) on the decision to build DIA 3. Who are the stakeholders and what are their interests or objectives? 4. Did the airlines support the decision to build DIA? 5. Why was the United opposed to expansion at Font Range Airport? 6. Why was the new baggage handling system so important to United? 7. What appears to be the single greatest risk in the decision to build DIA? 8. What impact do the rating agencies (i.e. Moody’s and Standard & Poor’s) have in the financing of the airport? 9. Assume that DIA finally opens and with a debt of $3billion. Is the revenue stream sufficient to pay interest each year and pay the principal at maturity? 10. What options are available to the DIA if the coverage falls below 100%? 11. Is there additional revenue space available (i.e. unused capacity) ? 12. What is the function of the Project management team (PMT) and why are two companies involved? 13. When did the effectiveness of the project management team begin to be questioned? 14. Did it sound as though the statement of work/ specifications provided by the city to the PMT were ‘vague’ for the design phase. 15. During the design phase, contractors were submitting re- estimates for work. 30 days after the original estimates and the new estimate were uo to $50 million larger than the prior estimates. Does this reflect...

Words: 326 - Pages: 2

Analysis of the Denver International Airport Baggage System

...Analysis of the Denver International Airport baggage system Michael Schloh Dan Stearns, advisor Title Abstract Contents Introduction Reasons For Automation Functionality Of Original BAE Design Problems and Solutions System Complexity Comparative Functionality Opening Delays Financial Hardship Summary Glossary References THE DENVER INTERNATIONAL AIRPORT AUTOMATED BAGGAGE HANDLING SYSTEM by Michael Schloh Computer Science Department School of Engineering California Polytechnic State University 1996 Date Submitted: February 16, 1996 Advisor: Daniel Stearns ABSTRACT This document discusses events at the new Denver International Airport that resulted in opening delays of the airport. The scope is limited to the automated baggage handling system, which was the primary source of failure warranting the airport's several opening delays. Analysis of the failing system is comprehensive. Research is conducted using a variety of sources. The final report is published on the worldwide web. CONTENTS Introduction 1 Reasons For Automation 2 Functionality Of Original BAE Design 3 Problems and Solutions 6 System Complexity 12 Comparative Functionality 14 Opening Delays 15 Financial Hardship 17 Summary 19 Glossary 20 References 21 INTRODUCTION This research concerns the automated baggage handling system which was built by BAE Automated Systems, Incorporated of Carrollton, Texas for the Denver International Airport. The analysis of this system provides an important topic of study. From the......

Words: 12573 - Pages: 51

International Hrm Analyses for Haelec Products Ltd

...International HRM analyses for Haelec Products Ltd | February 25 2014 | An analyses which will allow Haelec Management Team to implement an expansion programme in terms of establishing HR Policies abroad. | Jason Clark | 1.0 Introduction Since 1990, Haelec Products Ltd has grown from strength to strength in the production and manufacturing of various products including its latest creation of the Wireless Atomic Weather Station (WAWS). The demand for this product from Institutions and Governments had lead the need for the company to look into manufacturing the product overseas to be able to keep up with demand. This increased demand has main came from countries in and around the Indian Ocean and South China Sea, so it would seem beneficial to look into these countries for the consideration of setting up a production facility there. The countries that should be looked at include:- Indonesia India China These countries make up 70% of the orders from the area, so it would make sense to set the production facility in one of these countries. At present moment the current HR Policies and Procedure have worked extremely well for the company. However, these policy and procedures are very much tailored to the UK market and when a company is looked to expand abroad it might not all be suitable to implement the same policies into the country that you are moving to. Therefore, this report looks at the various aspects a company needs to look at when considering......

Words: 4201 - Pages: 17

Denver International Airport

...10. What impact do the rating agencies (i.e Moody’s and Standard & Poor’s) have in the financing of the airport? 11. On October 1, 1982, the United bonds were issued at an interest rate of 6.875 percent. Was this an appropriate coupon for the bonds? 12. There are numerous scenarios that can occur once the airport opens. The following questions are “what if” exercises and may not have a right or wrong answer. The questions are used to stimulate classroom discussion. The students must use the prospectus excerpts in the exhibit at the end of the case study. For each situation, what will be the possible outcome and what impact is there upon the bondholders? 13. Assume that DIA finally opens and with a debt of $3 billion. Is the revenue stream sufficient to pay the interest each year and pay the principle at maturity? 14. What options are available to DIA if the coverage falls below 100 percent? 15. Is there additional revenue space available (i.e., unused capacity) 16. What is the function of the project management team (PMT) and why were two companies involved? 17. When did the effectiveness of the project management team begin to be questioned? 18. Did it sound as though the statement of work/specifications provided by the city to the PMT was “vague” for the design phase? 19. Should the PMT be qualified to perform risk analyses? 20. Why were the architects coordinating the changes at the constructions site? 21. Should the PMT have been replaced...

Words: 255 - Pages: 2

Case Analysis Denver International Airport

...Running head: CASE REVIEW ANALYSIS OF THE DENVER INTERNATIONAL AIRPORT 1 Case Review Analysis of the Denver International Airport And Its Baggage Handling System Warner Sherman CASE REVIEW ANALYSIS OF THE DENVER INTERNATIONAL AIRPORT Table of Contents 2 Summary of Findings……………………………………………………………..………. 3 Background Information…………………………………………………….……............. 3 Problem Statement………………………………………………………………..…..…… 4 Analysis of Alternatives…………………………………………………………………… 4 Detailed Recommendations………………………………………………...……………... 5 Implementation and Evaluation…………………………………………………………… 6 References………………………………………………………………………………… 8 Appendix A.……………………………………………………………………………… 14 CASE REVIEW ANALYSIS OF THE DENVER INTERNATIONAL AIRPORT Summary of Findings 3 There has been considerable controversy documented through case study over the inadequacy of project and risk management structure associated with the Boeing Airport Equipment (BAE) automation design technology for a new baggage transport system at the Denver International Airport (DIA). Research background conducted by Kerzner (2011) under Case 23 revealed a documented tenyear history of this complex project with inherent risks. In another case study conducted by Montealegre, Keil, and Robinson (2000), a risk practice methodology was presented through “lessons learned” for improved implementation of the project’s risk management structure. Unfortunately, analogy comparisons for this type of project to incorporate......

Words: 4143 - Pages: 17

Corporate Governance Evaluation of David Jones Ltd, Billabong International Ltd, Ten Ltd and Energy World Corporation Ltd

...most promptly and have the authority and means to do so. With such due haste, the losses from such an event can be mitigated and the wellbeing of the company more easily preserved. 3. Is there an effective internal control system in place? A company faces jeopardy not only from without but also from within, for individual insiders can exploit their position for personal gain. A set of effective internal controls will discourage such opportunistic behaviour as, with it in place, such individuals will find it difficult to hide their unscrupulous activities (Gay & Simnett 2010). An internal audit function can assure the effectiveness of an internal control system. Assessment of corporate governance quality Billabong Billabong International Limited’s (Billabong’s) core business is the marketing, distribution, wholesaling and retailing of apparel, accessories, eyewear, wetsuits and hard goods in the board sports sector. The majority of revenue is generated through wholly-owned operations in Australia. Using our corporate governance model, the company’s corporate governance quality was ranked third, and can be significantly improved on in relation to remuneration disclosure. Structure the board to add value 1. Does the board comprise a majority of independent directors? Yes, six out of eight directors are non-executive members; however one of its non-executive members, Gordon Merchant is also the founder of the Billabong Group and is not independent because he is......

Words: 5767 - Pages: 24

Denver International Airport

...Benedictine Univeristy | Denver International Airport Baggage Handling System | MBA 683 | | Farrah R. Ansari | 10/1/2015 | | Denver International Airport Baggage Handling System The Denver International Airport, located in Denver Colorado, is the country’s largest airport based on total land area. The airport has the longest runway, is considered the 18th busiest airport in the world and the 6th busiest airport in the United States. There are nearly 53 million passengers that travel in and out of this airport. In the early 1990s the airport decided to create the world’s largest automated baggage handling system. In order to accommodate for the millions of passengers the project team felt this would be an effective project. The goal of the project was to create an automated baggage system that would reduce aircraft turnaround time to nearly 30 minutes. By reducing the turnaround time to a half an hour would allow for more efficient operations. The project team wanted to include this new system to all three concourses which included 88 airport gates. The concept of the project was well intended but poorly planned and executed by the project management team. The first flaw and biggest flaw of the project was the unrealistic scope. The project failed to set a realistic deadline or budget for the project. The deadline was exceeded by nearly 16 months, the budget by $560 million, and the overall intention of incorporate all three concourses was also not met....

Words: 560 - Pages: 3

Denver International Airport

...DENVER INTERNATIONAL AIRPORT AUTOMATED BAGGAGE HANDLING SYSTEM- PROJECT FAILURE ANALYSIS MSc Project Management Abstract The purpose of this study is to critically analyse the Denver International Airport Baggage Handling System project in order to detail the underlying reasons for the perceived failures in the project and to provide recommendations on how effective project management could have helped to avoid the problems the project encountered. A thorough analysis of the activities of the project from nature of project, contracting, design, construction, testing, stakeholder management, risk management, project controls, as well as the overall project leadership was carried out and failure causal factors were identified. A recommendation was also made on how the project should have been managed to ensure project success. The analysis viewed the project from both project management and project perspectives. Student: @00380661 25-Feb-14 Number of words: 2558 Table of Contents 1. 1.1 2. 2.1 Introduction ................................................................................................................. 2 Project Failure .......................................................................................................... 2 Discussion .................................................................................................................... 3 Failure Modes of the Project .............................................

Words: 4266 - Pages: 18

Effectiveness of the Aircraft Movement Areas Security Screening Procedures of the Airport Police Department at the Ninoy Aquino International Airport

...had been trying to be one step ahead of the terror groups in hardening aircraft and airport targets against all forms of terrorist attacks. However, on July 22, 1968, three gunmen from the Popular Front for the Liberation of Palestine (PFLP), hijacked a passenger airliner of the Israeli airline El Al, on a flight from Rome to Tel-Aviv, and demanded the release of their comrades-in-arms who were imprisoned in Israel. While this may not be the first case of civilian aircraft seizure during that year, this operation was qualitatively different in its content and ultimate aim. It was the first time that an aircraft had been hijacked not out of criminal motivation or for personal reasons, but with the specific goal of politically pressuring an opponent and using the incident as a propaganda message to bring a political cause to the world’s notice. Since the first recorded aviation security breach, security experts had been trying hard to harden aircraft and airport targets against all forms of terrorists acts. However, it took the World Trade Center terror act to make nation-states re-assess the threat situation against aviation security. Past incidents of attacks by disgruntled groups as well as by organized terror groups against airports and the rest of the airline industry has proven that Philippine civil aviation is not immune to terrorist acts, the most recent being the bombing of the International Cargo terminal of the NAIA, where the explosion resulted to scores wounded......

Words: 17180 - Pages: 69

Honda Motor Company Ltd. International Purchasing Division

...Honda Motor Company Ltd. International Purchasing Division History of Japanese Exports – Automotive Mr. Obi provided the interviewers with a book that was recently published by the Japanese Automobile Manufacturers Association (JAMA) called “Two Decades. . . “, (attached) which was for publicity purposes. This book was largely published to divert trade issue complaints, but really only states the facts on Japan’s investments in the United States in the automobile industry. The book notes that the commitment to localize production is not limited to assembly factories, but that Japanese auto companies have moved R&D and design facilities to the U.S., and also purchase a significant amount ($22 B) worth of auto parts from U.S. suppliers. Over the last twenty years, Japanese companies have invested $14 B, and now employ 43,000 US workers directly, plus 300,000 in the dealer networks. Of all the companies, Honda has one of the largest investments ($3B), surpassed only by Toyota’s facility in Kentucky ($3.9 B). However, Toyota has produced the most vehicles (634,374) than any other Japanese manufacturer. Honda’s Export Strategy The fact that Honda is leading the Japanese effort in the U.S. is not surprising. Honda is today the most globalized automobile manufacturer, (although still not the highest sales). In November 1997, the Honda Washington D.C. office released the report “Honda and U.S. – Japan Automotive Trade” (attached), which summarizes how Honda has become......

Words: 9073 - Pages: 37

Denver International Airport - Case Study

...Assignment – Denver International Airport (DIA) Individual Case Analysis Nicholas Y. Foo City University of Seattle PM501_03_IN: Intro to Project Management Larry D. Mitchell October 17, 2014 DIA – Individual Case Analysis The Denver International Airport was built and finally opened on February 28, 1995. It took the project nearly six years to complete with project costs initially estimated at $1.2 billion to the final cost of $5.0 billion. From the case study in Project management: a systems approach to planning, scheduling and controlling, DIA provided improved airfield configuration, improved efficiency in the operation of the regional airspace, reduced noise impacts, a more efficient terminal/concourse/apron layout, improved international facilities, significant expansion capability and enhanced efficiency of airline operations (Kerzner, 2001, pp. 645-646). Yet, the DIA construction project was inundated with many problems, conflicts of interest, increase scope changes and cost issues. Of which, the root cause is that DIA had poor Stakeholder involvement and accountability. In the PMBOK® Guide, a Stakeholder is “an individual, group, or organization who may affect, be affected by, or perceive itself to be affected by a decision, activity, or outcome of a project” (PMI, 2013, p. 563). The facts will show that our stakeholder involvement and accountability suffered throughout the DIA construction project. United Airlines and Continental had 80% of all the......

Words: 1951 - Pages: 8

Denver International Airport

...Denver International Airport Denver International Airport (DEN) is located 23 miles Northeast of downtown Denver Colorado. At 53 square miles it is the largest airport in the United States and the second largest airport in the world after King Fahd International Airport. Denver is also known for having one of the longest runways in the United States at 16,000 feet. DIA was built to replace the old an outdated Stapleton International Airport which was Colorado’s primary airport from 1929 to 1995. In September 1989, under the leadership of Denver Mayor, Federal Aviation officials authorized the outlay of the first $60 million for the construction of DIA. Two years later, Mayor Wellington Webb inherited the multi billion-dollar over budget megaproject, scheduled to open on October 29, 1993. Delays caused by poor planning and repeated design changes pushed the opening day back, first to December 1993, then to March and finally to May 15, 1994. In April 1994, the city invited reporters to observe the first test of the new automated baggage system. Reporters ended up watching clothing articles and personal items scattered all over the floor. The mayor cancelled the planned May 15 opening. The airport collects landing fees, rent and other revenues from the airlines to help offset its operating costs. Denver International Airport is owned and operated by the City and County of Denver, but does not operate using tax dollars. Instead, the airport is an "enterprise fund"......

Words: 1541 - Pages: 7

Commentaires | Lamps, Lighting | [ACESSE COMANDOTORRENTS COM] A Freira 2018 [HDRip BLURRED] [720p] [DUAL R5]